Side-by-side
What each option actually does, on the record.
The matrix below mirrors the six procurement questions enterprise buyers ask first — what monitors, what reports defend in audit, how dispatch lands, what wires in, how long to first incident, and how the bill grows.
| Feature | Pactwell | Protex AI | Intenseye | Spreadsheet audits |
|---|
| Always-on monitoringWhether a violation surfaces the moment it happens — including off-shift — or only during periodic review. | 24/7 cross-signal correlator over sensor + permit + CCTV — reasoned before it files. | Real-time on camera, but only inside trained coverage windows. | Real-time on camera, model-confidence-gated on PPE & unsafe-act classes. | Periodic sampling windows — off-shift incidents simply go unseen. |
|---|
| Audit-ready reportsWhether the evidence pack — timestamped CCTV frame, sensor reading, permit state — is captured at the moment of the breach or compiled afterwards. | PDF written at the alert step with cross-referenced CCTV frame + sensor + permit state. | Video-clip export per event — narrative context written by hand afterwards. | Video-clip export per event — narrative context written by hand afterwards. | Hand-written report from whoever remembered to take notes that week. |
|---|
| Work-order dispatchWhere the alert actually lands — the supervisor channel that can close the loop — and how the corrective fix turns into a verified record. | Email · SMS · Slack · webhook routes to the right supervisor channel per bay + shift. | Notification to a wall display and a single dashboard — supervisor copy-paste to dispatch. | Notification to a wall display and a single dashboard — supervisor copy-paste to dispatch. | Ticketing copy/paste from the report — no automatic routing, no escalation path. |
|---|
| Sensor compatibilityWhat kinds of signals are reasoned across, and whether new signal categories require an engineering engagement or a settings-page config. | Gas · temperature · vibration · restricted-area contact · lockout-tagout state — added by config per the FAQ. | Camera-only — every new signal category is an engineering project. | Camera-only — every new signal category is an engineering project. | Manual entry — every reading typed in by the floor crew on the day. |
|---|
| Setup timeFrom kickoff to the first flagged incident in verified state — and whether the cameras, sensors, and permits you already run stay where they are. | ~2 weeks to first flagged incident — four-step onboarding (connect sensors, register permits, point at VMS, author rules). | Model-training dependent — first reliable alerts typically arrive after a learning window. | Model-training dependent — first reliable alerts typically arrive after a learning window. | Instant — and still not live, because nothing fires between sample windows. |
|---|
| Pricing modelHow the bill grows with your floor, and whether the crew sees the system without hitting a seat-friction wall. | Per bay under active monitoring — never per seat — sized against real signal volume after pilot. | Per-camera plus a model-training subscription line item. | Per-camera plus a model-training subscription line item. | Labour cost — nights the safety team spends compiling the evidence pack before an audit. |
|---|
Competitor capability claims are written against publicly described positioning; for Pactwell, every claim in the leftmost column maps to a shipped surface — see the enterprise FAQ, pricing, and security & architecture. For the dedicated spreadsheet status-quo read, see the spreadsheet comparison.